JSW Steel's subsidiary, JSW Utkal Steel, has received documents for the possession of 2677.80 acres of forest land for a greenfield Integrated Steel Plant (ISP). The total land required for the plant is 2950.31 acres, with 2677.80 acres forest land and 272.51 acres non-forest land. The plant is expected to cost around Rs 65,000 crore and could take up to 5-7 years to reach its full capacity.