The project cost of Dhamra LNG terminal is Rs 6,450 crore, the sources said responding to Moitra's assertion that the terminal to import natural gas in its liquid form, called LNG, was built at a much higher cost than Rs 5,000 crore that IOC incurred in construction of a similar sized facility at Ennore in Tamil Nadu.