"As on 12.03.2023, the total coal stock available with coal-based thermal power plants monitored in CEA is 33.5 Million Tonne (MT), which is sufficient for an average of 12 days at a requirement of 85 per cent Plant Load Factor (PLF)," Union Power Minister R K Singh said in a written reply to Lok Sabha.