At present, there is a price ceiling of Rs 12 per unit in the Day Ahead Market (DAM) on the energy exchanges. With the ceiling, gencos having high variable costs for operating their plants are generally not keen on selling electricity on the energy exchanges and this in turn results in stranded power generation capacity.